Tips: How to deal with water ingress in injection molding machines?

       When a general injection molding machine is flooded, it may cause varying degrees of water ingress into the electrical controls, machine hydraulic system, lubrication system, etc. In such cases, it should be handled within the shortest possible time to minimize losses. The following aspects can be addressed:

General Principles
 

1. Disconnect all power sources, ensure the entire machine is disconnected from the computer;

2. Dismantle the flooded computer, drives, motors, and peripheral electrical components, rinse with clean water to remove surface contaminants and impurities;

3. Then process each part separately.


01 Computer Processing System
 

1. Remove the circuit boards, take out the built-in battery (if any);

2. Clean each circuit board with alcohol, let it air dry or oven dry before reassembly, and test with power separately.
 


02 Servo Processing System
 

1. Open the drive cover plate and place it vertically;

2. Remove the isolation mesh at the motor fan port and place it vertically;

3. After air drying or oven drying, reinstall the cover plate and isolation mesh;

4. Seek professional technical personnel for handling; do not disassemble the motor privately to avoid increasing losses.



03 Hydraulic Circuit Processing System
 

1. Check if the hydraulic oil has changed color due to water ingress. If water has entered, clean and dry the oil tank as soon as possible and replace all hydraulic oil.

Tip: How to check if hydraulic oil contains water

Open the plug at the bottom of the oil tank on the frame, release a small amount of oil, dip a piece of paper in it and ignite it. If it cannot ignite or makes crackling sounds during combustion, it indicates the presence of water in the hydraulic oil.
 

EST Tips
 

Post-incident precautions:

1. To avoid the risk of electric shock from residual water inside the machine, after confirming the equipment is thoroughly dried, it should also be placed in a ventilated and dry area for about one week before use.

2. Check the machine's grounding wire to avoid short-circuit faults caused by the grounding wire contacting water.
 

Time is efficiency
 

Cleaning the machine in the shortest time
 

Can prevent machine components from corrosion
 

Meaning losses can be minimized
 

If technical support is needed
 

Welcome to call EST 
 

400-080-1890
 

Fearless of wind and rain

EST is with you!



Halfway through 2021, mid year summary is underway!
2021-07-16

Halfway through 2021, mid year summary is underway!

Striving to be the pioneer on the path forward, looking to the future without forgetting the original intention. The jo...

Good news! Yishitong has been awarded the title of
2021-07-23

Good news! Yishitong has been awarded the title of "Little Giant" enterprise by the Ministry of Industry and Information Technology of China for its specialization, refinement, and innovation!

Recently, the Ministry of Industry and Information Technology announced the third batch of national-level "Little ...

Through thick and thin, we sail together with great love and sincerity - Yishitong collaborates with the Ningbo Fudan University Alumni Association to assist in the battle against epidemic prevention
2020-02-07

Through thick and thin, we sail together with great love and sincerity - Yishitong collaborates with the Ningbo Fudan University Alumni Association to assist in the battle against epidemic prevention

The current epidemic situationThe Estonians are in actionSince the prevention and control of COVID-19, Easton has been p...

hotline

400-080-1890

hotline
Contact Us
  • HQ: No. 66 Pufeng Road, Jiangbei District, Ningbo City
  • email: info@esto.cn

Mobile

二维码

Copyright: Ningbo Est Technology Co., Ltd.

ICP: 浙ICP备17036784号-1

浙公网安备浙公网安备33020502001032号